“The theatre, which is housed in the vaults beneath the station, will have to vacate the premises in December 2012. The building project will allow London Bridge station to cope with increased capacity and the Thameslink line.”
“The theatre, which is housed in the vaults beneath the station, will have to vacate the premises in December 2012. The building project will allow London Bridge station to cope with increased capacity and the Thameslink line.”