“After commissioning several technical surveys, the trust has posted a feasibility study by structural engineering firm Robert Silman Associates that assesses three possible solutions to the ever-worsening threat of floods: permanently elevating the house by putting a nine-foot hill underneath it, relocating it to higher ground on the site, or building the aforementioned hydraulic lift, which would use a set of four steel trusses to raise the house by nine feet when needed.”