That’s A Mighty Big Swirl – Installing A Serra

“A rigging crew was completing the installation of “Sequence” on a recently poured concrete slab behind the museum. A giant crane, hired by the riggers, stretched several stories above the buildings’ roofline. Placement and assembly of the 235-ton piece had gone smoothly, taking only about three days.”