A month after the disastrous flood of November 12, the president of the historic church’s governing body said that the building cannot withstand repeated exposure to salt water it has faced the past two years. He and his colleagues want “to surround the basilica on the side of the square with a two-metre-high Perspex wall and sheet piles sunk four metres deep into the ground.” – The Art Newspaper
Tag: 01.03.20
MoMA’s Accessibility Crunch: Too Many Long Lines, Too Many Stairs, Not Enough Chairs
I gave the newly expanded Museum of Modern Art a test it was bound to fail by revisiting on the Sunday after Christmas—a tourist-heavy time of year. Below is my report card, along with some pro-tips for navigating the obstacles and minimizing the amount of time wasted in waiting. – Lee Rosenbaum